Connected Battery Cost Calculator: How Much Can You Save Across 100, 500 or 1,000 Deployments?

When connected battery solutions are deployed at scale, a small difference in per-unit hardware cost can have a meaningful impact on the project budget. Using the illustrative component prices supplied for the Yatis UART configuration and a reference CAN-based configuration, the combined BMS + IoT hardware difference is ₹2,550 per deployment. Use the calculator below to estimate the difference for your planned quantity.
ILLUSTRATIVE HARDWARE COST DIFFERENCE PER DEPLOYMENT
Scale the difference.
See the budget impact.
Calculate the comparison at your planned deployment volume—without hiding the assumptions.
Connected battery hardware cost: the two configurations
The calculation uses the component prices in the Yatis Connected Battery Systems comparison. It adds the BMS and IoT device amounts for each configuration, then subtracts the Yatis UART total from the reference CAN-based total.
Combined BMS + IoT hardware per deployment
- BMS: ₹3,500
- IoT device: ₹2,500
Combined BMS + IoT hardware per deployment
- UART BMS: ₹1,250
- IoT device: ₹2,200
Try the connected battery cost calculator
Enter your planned deployment quantity. The calculator uses fixed illustrative unit costs: ₹6,000 for the reference configuration and ₹3,450 for the Yatis UART configuration.
Calculation: quantity × unit hardware cost. No other project costs included.
What does the saving look like at 100, 500 and 1,000 deployments?
| Deployment quantity | Reference CAN-based total | Yatis UART total | Illustrative difference |
|---|---|---|---|
| 100 | ₹6,00,000 | ₹3,45,000 | ₹2,55,000 |
| 500 | ₹30,00,000 | ₹17,25,000 | ₹12,75,000 |
| 1,000 | ₹60,00,000 | ₹34,50,000 | ₹25,50,000 |
The calculation is linear because it applies the same illustrative unit-price difference to each deployment. It does not assume volume discounts, negotiated pricing, installation economies or changes in the hardware specification.
How is the connected battery saving calculated?
The formula is deliberately simple and transparent:
Reference configuration per deployment = ₹3,500 BMS + ₹2,500 IoT = ₹6,000
Yatis UART configuration per deployment = ₹1,250 UART BMS + ₹2,200 IoT = ₹3,450
Illustrative difference per deployment = ₹6,000 − ₹3,450 = ₹2,550
Illustrative percentage difference = ₹2,550 ÷ ₹6,000 × 100 = 42.5%
Deployment-level difference = ₹2,550 × number of deployments
This is a comparison of the two specified hardware configurations—not evidence that every UART BMS costs less than every CAN BMS. The interface must suit the BMS architecture and system requirements. For a technical explanation, read UART vs CAN-Based BMS: Understanding the Hardware Cost Difference.
What is included—and what is not?
Price transparency matters when comparing battery IoT cost, BMS hardware cost or battery monitoring system price. The supplied Yatis product material describes the figures as illustrative BMS + IoT hardware prices and states that the following items are excluded:
- Taxes
- Installation
- Connectivity
- Platform fees
Hardware cost is only one part of deployment cost
A connected battery project may also involve BMS compatibility work, device installation, connectivity, platform access, testing, support and ongoing operations. These items should be scoped separately so a procurement team can compare like with like.
| Cost category | Question to confirm | Included in this calculator? |
|---|---|---|
| BMS hardware | Which BMS model and interface are included in the selected configuration? | Yes, illustrative component price |
| IoT hardware | Which device and connectivity hardware are included? | Yes, illustrative component price |
| Installation | Is installation charged per unit, site or project? | No |
| Connectivity | What SIM, data plan and recurring charges apply? | No |
| Platform fees | Are platform charges per vehicle, battery, device or user? | No |
| Integration and testing | Is protocol mapping, validation or custom development required? | No |
| Taxes and support | What taxes, warranty and support terms apply? | No |
Does the lower-cost configuration fit your battery?
A lower illustrative hardware price is useful only if the configuration is technically suitable. The Yatis UART proposition should be evaluated against the actual BMS model, interface and required data or commands. Confirm electrical levels, pinout, serial settings, protocol documentation, available battery parameters and supported remote commands before finalising a deployment.
For more detail on the monitoring data that may be available through a compatible integration, see Connected Battery Monitoring: SoC, Cell Voltage and Temperature. To understand the wider connected workflow, read GPS Tracking and Remote Battery Control in One Solution.
How Yatis positions the connected battery proposition
The supplied Yatis product material describes a connected battery setup that can bring together supported BMS information, GPS location, driving-behaviour insights and supported remote battery commands. For a compatible UART BMS, the described connection uses a TTL serial interface to an IoT device, followed by cellular connectivity to the Yatis platform.
That means the commercial discussion need not stop at the component price. Battery manufacturers and EV OEMs can also evaluate the data they need to monitor, the vehicle visibility they require and the BMS commands their system is designed to support. Start with the Yatis Telematics website or explore the Yatis Resources library for more information.
Frequently asked questions
What is the connected battery cost per deployment in the Yatis comparison?
The supplied comparison lists ₹3,450 for the Yatis UART BMS + IoT hardware configuration. This is an illustrative hardware figure, not a complete deployment quotation.
How much is the illustrative saving per connected battery deployment?
The difference between the ₹6,000 reference CAN-based configuration and the ₹3,450 Yatis UART configuration is ₹2,550 per deployment, equal to 42.5% of the reference amount.
How much can 100 deployments save?
At the illustrative ₹2,550 difference per deployment, 100 deployments produce a difference of ₹2,55,000.
How much can 500 deployments save?
At the illustrative ₹2,550 difference per deployment, 500 deployments produce a difference of ₹12,75,000.
How much can 1,000 deployments save?
At the illustrative ₹2,550 difference per deployment, 1,000 deployments produce a difference of ₹25,50,000.
Does the connected battery cost calculator include installation and connectivity?
No. It compares only the stated BMS + IoT hardware prices. Taxes, installation, connectivity and platform fees are excluded, as are other possible project costs.
Is UART always cheaper than CAN for a BMS?
No. The 42.5% figure applies only to the two specific illustrative configurations supplied by Yatis. Actual cost and technical suitability depend on the BMS, hardware, interface and integration requirements.
How can I get a project-specific connected battery quotation?
Share the target BMS make and model, deployment quantity, required battery data, remote commands and installation scope with Yatis so compatibility and commercial requirements can be reviewed.
Planning 100, 500 or 1,000 connected battery deployments?
Use the illustrative calculator as a starting point, then validate your BMS compatibility and full project scope with Yatis.
Request a project discussionVisit Yatissales@yatis.io · +91 95133 44858
Related Yatis reading
For broader company and product information, visit Yatis Telematics or browse the Yatis Resources library.
External technical references
- Texas Instruments: Battery monitors and balancers — technical background on battery-monitoring components and measurement functions.
- Texas Instruments: Battery management systems for HEV/EV applications — reference material on BMS architecture and functions.
- BlackRock IoT — device supplier website referenced in the supplied Yatis product collateral.
